- Commissioned CEMS Enclosure
- Demin Tank cleaning
- Flushing Underground Fire Loop
- Gas Blows
- Gas Compressor Inspection
- Gas Turbine Boroscope
- GSU Spray Test
- High Voltage Interconnection
- Highwood Landscaping
- Highwood Sign
- Hwy 228 completion
- Lube Oil Flush Equipment
- Sound Wall Installation Complete
- Unit Aux Spray Test
- SME Switchyard
- Phase 1 O&M Trailer
- Completed Water Treatment Building, Fire Pump House, and Water Tanks
- Fuel Gas Compressor Station
- Completed Fuel Gas Metering Station and Connection to Energy West
- Completing the Inlet Heating System
- Phase 1 Control Room
- NWE Switchyard – Critical Path to Plant Operation
- Fire Protection System Components
- Power Block Profile Nearly Complete
- Installing Fire Alarm System
- Quest Cable Relocation for 228 Improvements
- Heat Tracing for Freeze Protection
- Cable Terminations Continue
- Work Begins on Highway 228 Improvements
- A Frame for High Voltage Cables to the GSU Transformer
- Gas Turbine and Stack Progress
- GSU Installation Progress
- Switchyard Equipment Being Installed
- Insulating the Service/Fire Water Tank
- Pulling Cable in PCM
- Stack Installation Progress
- Turbine to Generator Coupling
- Various Switchyard Equipment
- Unloading Inlet Heating System Equipment
- Staged Inlet Heating System Equipment
- Installation of Power Module
- Installation of Generator in Enclosure
- Generator in Enclosure
- Fuel Gas Compressor and Electrical Foundation
- Concrete Pour for Ductbanks
- Foundation Work
- Earth Work
- Laydown Area
- Laydown Area
- Laydown Area
- Road Work
- Ditch Work
- Trench for Underground Water Loop